Projects
Updating of the Numerical Groundwater Flow Model for the Lower Kuiseb River Aquifers
Location: Eronga Region, southwest Namibia
During 2017 GCS Water & Environmental Engineering Namibia (Pty) Ltd was appointed to update the numerical groundwater flow model for the lower Kuiseb River Aquifers which was developed in 2014. The project entailed reassessment of the aquifer system to determine the long-term sustainable and optimal utilization of the aquifer, updating of the conceptual model, review and update the boundary conditions and aquifer properties (where applicable), calibration of the groundwater flow model, simulations of various abstraction scenarios and calculation of sustainable yield.
Mine Closure Plan for Zinc Mine
Location: Rundu, Kavango East Namibia
During 2010 GCS Water & Environmental Engineering Namibia (Pty) Ltd was
commissioned to compile a “Final Draft Mine Closure Plan” for a Zinc mine in southern Namibia. Investigation involved an assessment of the Env and social aspects for the potential closure of the mine.
An assessment was completed at the mine on the waste rock dumps, open pit and surface water management system. The social investigation involved and assessment of the Rosh Pinah town with RoshSkor and local and regional authorities to optimise the mine closure strategy.
The investigation of the waste rock dumps and tailings facility involved the re-assessment of the placement of the waste with a defined sustainable closure. Strategy.
The original Mine Closure Plan for the mining pit was to backfill the pit with waste rock and inert material. During the closure Study, it was identified that backfilling of the open pit would be a very costly and it was proposed that the mine pit should be allowed to flood, and this be incorporated into the Zinc mine closure plan as a final pitlake.GCS proposes to setup a groundwater flow model in order to investigate the groundwater flow and the pit water balance, coupled with a contaminant transport model (geochemical model) which would investigate the chemical evolution of the water, stratification and the potential for mirromixes (potential inversions of pit water with seasonal temperature fluctuations).
Environmental Impact Assessment for the Proposed Township Establishment
Location: Rundu, Kavango East Namibia
During 2023 GCS Water & Environmental Engineering Namibia (Pty) Ltd was appointed to undertake an independent Environmental Assessment (EA) in order to obtain an Environmental Clearance Certificate (ECC) for the proposed township establishment in Rundu, Namibia to provide additional residential erven to help cater to the increasing demand for residential properties in the town of Rundu. The scope of work included:
• Environmental Impact Assessment
• Environmental Management Plan
• Public Participation
• Application for Environmental Clearance Certificate.
Environmental Impact Assessment for the Proposed Establishment of the Flexible Land Tenure Schemes in Ombili and Bonya Informal Settlements
Location: Helao Nafidi, Ohangwena Region, Namibia
During 2023 GCS Water & Environmental Engineering Namibia (Pty) Ltd was appointed to undertake an independent Environmental Impact Assessment (EIA) for the Flexible Land Tenure Schemes in Ombili and Bonya Informal Settlement.
Flexible Land Tenure Schemes involves the development of land resettlement schemes, creation of erven (with varying land uses), creation of streets and installation of bulk services.
GCS conducted the EIA for these Flexible Land Tenure Schemes, inclusive of public participation to be undertaken as part of the EIA process.
Environmental and Social Impact Assessment for the Proposed Rundu Purification Plant Upgrade
Location:Rundu, Kavango East Region
During 2019 GCS Water & Environmental Engineering Namibia (Pty) Ltd was appointed to undertake an independent Environmental Impact Assessment (EIA) for the Rundu Treatment Plant expansion project.
The scope of work covered for the project included:
• Environmental Impact Assessment
• Environmental Management Plan
• Public Participation
• Application for Environmental Clearance Certificate.
EIA for the Construction of Telecommunication Towers in the Erongo, Kunene, Otjozondjupa, Omusati and Kavango West Regions, Namibia
Location:Rundu, Kavango East Region
During 2020 GCS Water & Environmental Engineering Namibia (Pty) Ltd was appointed to undertake an independent Environmental Impact Assessment (EIA) for the proposed telecommunication tower construction which was commissioned by MTC in 2017. The project aims to strengthen the coverage for mobile services, inclusive of voice and data services within the subject areas. The scope of work covered for the project included:
• Environmental Impact Assessment
• Environmental Management Plan
• Public Participation
• Application for Environmental Clearance Certificate.
Environmental Impact Assessment for the Proposed Township Establishment, creation of street and installation of bulk services for Omadhiya Proper and Omadhiya Extension 1, Omuthiya, Oshikoto Region
Location:Omuthiya, Oshikoto Region, Namibia
During 2021 GCS Water & Environmental Engineering Namibia (Pty) Ltd was appointed to undertake an independent Environmental Impact Assessment (EIA) for Township Establishment in Omuthiya, Namibia.
Township Establishment involves the creation of erven (with varying land uses), creation of streets and installation of bulk services. GCS conducted the EIA for this township development, inclusive of public participation to be undertaken as part of the EIA process.
The scope of work covered for the project included:
• Environmental Impact Assessment
• Environmental Management Plan
• Public Participation
• Application for Environmental Clearance Certificate